Sorry for the delay. A whole lot of work has happened since last post…and here is some documentation.

So first, our floor got painted.

This is where the ring will go.

I don't think I'm giving anything away to say that there's a trap. Someone, at some point, will come up from here.

Desmin takes it all in. He'll spend a lot of time on this stage over the next month plus.

Oh, and this poster is up outside the theater now. Life-size and all.
Lots more following very, very soon. I mean it this time.
(The sets are designed by Brian Sidney Bembridge, FYI.)
This entry was posted on Wednesday, September 16th, 2009 at 1:50 pm and is filed under Chad Deity. You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.